Energy/ Renewables

Hydropower, Solar, and Power Transmission & Distribution

ICTC has worked with World renowned developers, investors, engineering firms, contractors and equipment vendors in the engineering, construction and supply of major HYDRO POWER and ELECTRIC TRANSMISSION, DISTRIBUTION and SUBSTATION PROJECTS in Nepal. ICTC was involved in many of the government’s generation plants and transmission systems. Our well acknowledged services have extended to all major public undertakings and also include Nepal’s first Independent Power Producer.

Energy/ Renewables

Energy & Renewables Projects

Showcase of our Hydropower and Transmission Line Projects.

img-0
Raft concrete work in auxiliary powerhouse at Middle Bhotekoshi HEP
img-1
Excavation at headworks of Middle Bhotekoshi HEP
img-2
Map of 102 MW Middle Bhotekoshi Hydroelectric Project
img-3
Concreting in powerhouse at Middle Bhotekoshi HEP
img-4
Headworks excavation at Middle Bhotekoshi HEP
img-5
Tower stringing for Koshi Corridor Transmission Line
img-6
Foundation and towers for Koshi Corridor Transmission Line
img-7
Transmission line tower stringing work
img-8
Koshi Corridor Transmission Line construction
img-9
Transmission line foundation work
img-10
Koshi Corridor tower foundation
img-11
Transmission line infrastructure development
img-12
Dumkibas High Voltage Substation
img-13
14 MW Modi Khola HEP Powerhouse
img-14
132 kV Substation at Kohalpur
img-15
512 MW Bharbung Storage Hydroelectric Project Feasibility Study
img-16
Bhaktapur 132 kV Substation
img-17
Substation construction
img-18
Substation equipment installation
img-19
View of Attariya substation work
img-20
132 kV Transmission Line for 30 MW Chameliya HPP
img-21
Kulekhani II Storage Hydropower Station restoration
img-22
Kulekhani II emergency restoration work
img-23
140 MW Tanahu Storage Hydroelectric Project
img-24
Tanahu Storage HEP construction
img-25
750 MW West Seti Storage Hydroelectric Project
img-26
Map of 750 MW West Seti Storage Hydroelectric Project
img-27
West Seti Storage HEP overview
img-28
132 kV Transmission Line Nepalgunj-Mahendranagar
img-29
132 kV Transmission Lines and Substation Butwal-Nepalgunj
img-30
402 MW Arun-3 HEP Model Testing
img-31
402 MW Arun-3 HEP Feasibility Study
img-32
Solu hydroelectric project
img-33
132 kV Transmission Lines and Substation Lekhnath Switchyard
img-34
132 kV Substation Chandranigahpur
img-35
Chandranigahpur substation infrastructure
img-36
Hydraulic steel structures for Lower Marsyangdi HEP
img-37
Lower Marsyangdi HEP control panel
img-38
69 MW Lower Marsyangdi Hydroelectric Project
img-39
Lower Marsyangdi HEP intake valve
img-40
Lower Marsyangdi HEP trifurcation
img-41
Lower Marsyangdi HEP Francis turbine
img-42
Hydromechanical systems for Lower Marsyangdi HEP
img-43
Steel structures installation at Lower Marsyangdi HEP
img-44
62 MW Humla Karnali Hydroelectric Project Feasibility Study
img-45
220 kV Khimti-Dhalkebar Transmission Line construction
img-46
Khimti-Dhalkebar transmission line infrastructure
img-47
220 kV transmission line development
img-48
Transmission line tower installation
img-49
Khimti-Dhalkebar line construction progress
img-50
Chameliya HEP electrical and hydromechanical equipment
img-51
30 MW Chameliya HEP 132 kV Transmission Line
img-52
Chameliya HEP equipment installation
img-53
Chameliya HEP mechanical equipment
img-54
Chameliya HEP electrical systems
img-55
Chameliya HEP project equipment
img-56
Chameliya HEP installation work
img-57
Chameliya HEP technical equipment
img-58
Chameliya HEP systems installation
img-59
Chameliya HEP equipment overview
img-60
Chameliya HEP installation progress
img-61
900 MW Upper Karnali Hydroelectric Project map
img-62
Upper Karnali HEP project map
img-63
900 MW Upper Karnali Hydroelectric Project
img-64
132kV GIS Switchgear Kali Gandaki A HEP
img-65
Upper Tamakoshi HEP construction at Lamabagar Plain
img-66
Upper Tamakoshi HEP construction progress
img-67
Upper Tamakoshi HEP tunnel construction
img-68
Upper Tamakoshi HEP construction site
img-69
Upper Tamakoshi HEP ongoing construction
img-70
Upper Tamakoshi HEP development
img-71
Upper Tamakoshi HEP infrastructure
img-72
Upper Tamakoshi HEP intake area construction
img-73
Upper Tamakoshi HEP Gongar aerial view
img-74
Upper Tamakoshi HEP project development
img-75
Middle Marsyangdi HEP electrical equipment layout
img-76
Middle Marsyangdi HEP generator installation
img-77
Middle Marsyangdi HEP control panel
img-78
Middle Marsyangdi HEP stator frame preassembly
img-79
Middle Marsyangdi HEP dovetail bar installation
img-80
Middle Marsyangdi HEP rotor insertion
img-81
Middle Marsyangdi HEP thrust bearing installation
img-82
Middle Marsyangdi HEP stator air guide installation
img-83
Middle Marsyangdi HEP stator winding preparation
img-84
Middle Marsyangdi HEP unit 2 installation
img-85
72 MW Middle Marsyangdi Hydroelectric Project
img-86
Middle Marsyangdi HEP systems installation
img-87
Middle Marsyangdi HEP rotor core pressing
img-88
Middle Marsyangdi HEP instrumentation installation
img-89
Middle Marsyangdi HEP unit 1 installation
img-90
Middle Marsyangdi HEP electrical equipment overview
img-91
Middle Marsyangdi HEP spiral casing
img-92
Middle Marsyangdi HEP stator core pressing
img-93
Middle Marsyangdi HEP project overview
img-94
Middle Marsyangdi HEP stator winding work
img-95
Middle Marsyangdi HEP Francis turbine testing
img-96
Middle Marsyangdi HEP CO2 system
img-97
Rolwaling Diversion Project detailed design
img-98
132 kV transmission line installation
img-99
Lekhnath switchyard for KGA HEP
img-100
60 MW Khimti 1 hydroelectric project
img-101
Khimti 1 project overview
img-102
Tamakoshi V Hydroelectric Project detailed design
img-103
Tamakoshi V project planning
img-104
132 kV Lamusangu Substation
img-105
30 MVA Transformer Dubahi Substation
img-106
Kali Gandaki A HEP control panel
img-107
Kali Gandaki A HEP runner turbine
img-108
Kali Gandaki A HEP generator equipment
img-109
Kali Gandaki A HEP hydraulic steel structures
img-110
Kali Gandaki A HEP hydraulic systems
img-111
Kali Gandaki A HEP steel structures installation
img-112
Kali Gandaki A HEP rotor assembly
img-113
Kali Gandaki A HEP stator transportation
img-114
Kali Gandaki A HEP Francis turbines
img-115
Kali Gandaki A HEP structural systems
img-116
Kali Gandaki A HEP steel gates installation
img-117
144 MW Kali Gandaki A Hydroelectric Project
img-118
Kali Gandaki A HEP powerhouse view
img-119
Kali Gandaki A HEP turbine installation
img-120
Kali Gandaki A HEP turbine parts transportation
img-121
Kali Gandaki A HEP damsite HVAC system
img-122
Kali Gandaki A HEP hydraulic systems installation
img-123
Kali Gandaki A HEP draft tube
img-124
Rasuwagadhi HPP EPC contract works
img-125
Rasuwagadhi HPP headwork construction
img-126
Rasuwagadhi HPP tunnel and headwork
img-127
Upper Trishuli 3A 220kV transmission line
img-128
Upper Trishuli transmission line construction
img-129
Upper Trishuli 3A line infrastructure
img-130
Upper Trishuli transmission project

Key Services

  • Project identification and license acquisition
  • Feasibility, detailed design, and environmental assessments
  • EPC contract execution for civil and HM works
  • Turnkey contracts for electromechanical equipment
  • Strategic local partnership and fund sourcing

Our Expertise

  • Hydropower Development (up to 900 MW)
  • High Voltage Transmission Lines (up to 220kV)
  • Substation and Switchyard Construction
  • Operation and Maintenance (O&M)

Notable Projects

  • 1980-1996 69 MW Marsyangdi HEP Civil Works, Hydraulic Steel Structures, Hydromechanical Equipment, Training, including sourcing of fund
  • 1992 Trishuli HEP Rehab Works
  • 1992-1995 402 MW Arun-3 HEP Feasibility Study, Detailed Engineering Design
  • 1993 Kulekhani Storage HEP Emergency Rehab Civil Works
  • 1996 60 MW Khimti I HEP Electromechanical Equipment
  • 1997-2004 144 MW Kali Gandaki A HEP Hydraulic Steel Structures, Hydromechanical and Electromechanical Equipment, Transmission Line and Substations, Operation and Maintenance
  • 2000 & 2005 27 MW Khimti II HEP Feasibility Study and Survey License
  • 2001-2008 72 MW Marsyangdi HEP Civil Works, Hydraulic Steel Structures, Hydromechanical and Electromechanical Equipment, including sourcing of funds
  • 2007-2022 30 MW Chameliya HEP Hydromechanical and Electromechanical Equipment, Transmission Line and Substations, including arrangement of sourcing of funds
  • 2011-2018 750MW West Seti Storage Investment (License)
  • 2007-Ongoing 900 MW Upper Karnali HEP Complete Project cycle including Project Development and License through competitive bidding
  • 2004-2022 456 MW Upper Tamakoshi HEP Feasibility Study, Detailed Design and Construction Supervision
  • 2016-2022 140 MW Tanahu HEPP Consulting (Supervision)
  • 250 MW Upper Arun HEP Engineering Works
  • 14 MW Modi Khola Electromechanical Equipment
  • 2016-2025 111 MW Rasuwagadhi HEP Civil Works and HM EPC
  • 2016-2022 101 MW Mid-Bhotekoshi HEP Consulting (Supervision)
  • 2016-2018 87-100 MW Tamakoshi V Consulting (Design)
  • 2016-2018 22.5 MW Rolwaling Consulting (Design)
  • 2020-2024 Humla-Karnali (62 MW) Feasibility & EIA Study
  • 2020-2026 Bharbhung Storage (512MW) Feasibility & EIA Study
  • 2020-2024 Tatu ROR Project (10 MW) Feasibility & EIA Study
  • 2016-2018 186MW Tamakoshi-3 ESIA + Feasibility Study
  • 2016-2018 186MW Tamakoshi-3 Power Access Study
  • 1983 132 KV Dumkibas – Butwal TL and SS
  • 1984 132 KV Kulekhani – Kathmandu TL
  • 1984, 1987 132 KV Butwal – Nepalgunj TL
  • 1989, 1991 132 KV Nepalgunj – Mahendranagar TL and SS
  • 1990s Rehab of Karnali (Transmission) Network
  • 1990s 132kV Hetauda – Gandak TRL
  • 1990s 132kV Kulekhani II – Kathmandu TRL
  • 1990 66 KV Dipayal – Atarriya TL
  • 1996 132 KV Khimti – Bhaktapur TL
  • 1998 132 KV Kali Gandaki – Pokhara – Kathmandu TL
  • 2006 220 KV Khimti – Dhalkebar TL
  • 2006 132 KV Chandranigapur SS
  • 2008 132kV Chameliya - Attariya TRL+SS
  • 2011 132 KV Butwal – Kohalpur SS
  • 2011 132 KV Upper Trisuli – Kathmandu TL
  • 2018 220 kV Tamakoshi-Kirne TRL
  • 2018 220 kV Butwal-Kohalpur 2nd Ckt TRL
  • 2021 220 kV Koshi Corridor TRL
  • Nationwide Hydropower MasterPlan Engineering
  • NEA – Twinning & Corporate Planning
  • NEA – Design & Implementation of NEA Training Facilities
  • NEA – Long Run Marginal Study
  • NEA – Transmission Line Master Plan
  • NEA – Generation Master Plan, Distribution Master Plan
  • NEA – Transmission Line Consulting Services
  • NEA – Feasibility of Chilime-Trishuli TRL 132kV